@BrandonHoang_ I'm feelin hella honored
Please spare me, Miffy.
Being adult
Lean times
Takin photos of neons and slappin on a filter
drawings from 2017 of trisha (around this time she claimed her house was haunted by vampires)
It's the last day of anime expo and i only have two of these cat pins left. I guess i'm actually at table A08, not A07 haha